Rent reduction for other defects: court rulings and percentages
In 19 rulings in our table, courts allowed a rent reduction of 2 % to 100 %. How much depends on how far the defect restricts the use of the apartment.
Updated: October 2026 · 119 court rulings
Calculate reduction →19 rulings found
Enforce your right to rent reduction
Create a free defect notice with a rent reduction demand — backed by these court rulings.
| Defect | Reduction | Court / Ref. | Date | Severity | Description | Letter |
|---|---|---|---|---|---|---|
| Other | 100 % | LG Würzburg44 S 119/23Bavaria | 10.05.2023 | Severe | Apartment uninhabitable after a kitchen fire the tenant did not cause through gross negligence; the landlord's building insurance applies | Letter |
| Other | 100 % | LG Dresden4 S 73/10Saxony | 25.02.2011 | Severe | Weakly bound asbestos constantly releases fibers (top remediation urgency); apartment unfit to live in | Letter |
| Other | 100 % | LG Berlin65 S 117/02Berlin | 30.08.2004 | Severe | Extremely high levels of carcinogenic PAHs in the indoor air; apartment uninhabitable | Letter |
| Other | 50 % | AG Bielefeld408 C 180/24North Rhine-Westphalia | 11.09.2025 | Severe | Landlord secretly kept a key and entered the apartment without permission | Letter |
| Other | 25 % | AG Potsdam26 C 406/94Brandenburg | 09.03.1995 | Severe | Apartment door cannot be locked; security and insurance risk | Letter |
| Other | 25 % | AG Gelsenkirchen428 C 498/15North Rhine-Westphalia | 01.12.2016 | Moderate | Damaged bathroom and drafty, poorly closing windows (combined rate) | Letter |
| Other | 20 % | LG Kassel1 S 274/84Hesse | 03.07.1987 | Moderate | Faulty seals on windows and doors; strong drafts and water getting in | Letter |
| Other | 20 % | AG Charlottenburg239 C 196/17Berlin | 14.12.2017 | Moderate | Advertising banner on scaffolding covered 4 of 5 windows and the balcony | Letter |
| Other | 20 % | LG Berlin18 S 133/15Berlin | 11.02.2016 | Moderate | Damaged and missing asbestos floor tiles (Floor-Flex); reduction from the start of the lease | Letter |
| Other | 15 % | AG Villingen-Schwenningen11 C 243/14Baden-Württemberg | 03.09.2015 | Moderate | Leaky windows with drafts and heat loss | Letter |
| Other | 15 % | LG Berlin64 S 223/17Berlin | 17.10.2018 | Moderate | Asbestos floor tiles (Floor-Flex) with many damaged spots that can release fibers | Letter |
| Other | 12 % | AG Tempelhof-Kreuzberg8 C 186/17Berlin | 14.12.2017 | Moderate | After modernization, window areas a third smaller in four rooms; 3% per window | Letter |
| Other | 10 % | AG Frankfurt a.M.33 C 1251/17 (76)Hesse | 18.08.2017 | Moderate | Strong cold drafts from the ventilation system in a passive house | Letter |
| Other | 10 % | LG Berlin65 S 296/10Berlin | 28.01.2011 | Moderate | Strong smell of decay and feces from the neighboring apartment | Letter |
| Other | 8 % | AG Tempelhof-Kreuzberg24 C 19/21Berlin | 22.02.2022 | Minor | Pungent smell from a bakery on the ground floor in the mornings; later 5% | Letter |
| Other | 5 % | AG Schöneberg13 C 129/20Berlin | 11.02.2021 | Minor | Less daylight after modernization due to insulation, smaller windows and a balcony above | Letter |
| Other | 4.8 % | BGHVIII ZR 51/20 | 12.10.2021 | Minor | Bicycle cellar reduced from 49 to 7 m² by modernization (rate of the lower court upheld) | Letter |
| Other | 4 % | AG Gießen48 C 48/15Hesse | 05.11.2015 | Minor | Persistent bad smell in the stairwell | Letter |
| Other | 2 % | LG Berlin64 S 356/98Berlin | 16.02.1999 | Minor | Intercom does not work | Letter |